Rack Move
- Back up VMs
- Back up UniFi
- Back up Synology Config
- Validate documentation on ports, vlans, and teams (including patch panel and PDU)
- Assemble Rack
- Install shelves, UPS rails, install server rails.
- Power down equipment.
- Remove equipment from old rack and install in new
- Manage cables as reconnecting everything.
- Install old PDU for server power supply 2, monitor, other equipment not mission critical.
- Power on equipment.
- Test connectivity.
Tools -
Hex driver bits
Phillips Driver
Rack tape measure
level
light
Equipment added-
vertical cable management
server rails
velcro
cage nuts
shelves